City of Alton

Alton Multi Modal Transportation Center

Scope: Wegman Electric scope of work included the following:

• Furnished all labor and material to install new primary conduits for Ameren’s new infrastructure that will accommodate the transportation center and any future facilities.

• Furnished all labor and material to complete the installation of the a new 1000amp 208v main panel.

• Furnish labor to install new 60kw Generator for the MCTs portion of the facility.

• Furnished all labor and material to all new LED site lighting and associated conduits.

• Furnished a subcontractor to install a 100-foot tower with a 4-foot antenna, there is a 4-foot antenna mounted on an MCT tower in Edwardsville, these 2 towers were aimed and adjusted to communicate together.

• Furnished labor and material to install all new LED lighting in offices, hallways, restrooms and main waiting area.

• Furnished labor and material to install all new LED outdoor lighting around the building.

• Furnished labor and material to install all automatic lighting controls to accommodate the IEC for energy usage.

• Furnished labor and material to install a fully functional fire alarm system.

• Furnished labor and material to install a fully functional card access system.

• Furnished labor and material to install 125 cameras in the building and on the newly installed site lighting poles, this includes the Amtrak portion on the platform near the train tracks, these are monitored by the city of Alton.

• Furnished labor and material to install a fully functional voice data cabling system, tested and certified.

• Furnish labor and material to install a fully functional PARC system.

Crafts Utilized: Local 649 IBEW Inside Wireman, VDV technicians.

Subcontractors: RCS Construction-excavation and pole bases. Link Technologies-tower and tower equipment. Barcom Fire and security.

Safety: There were no accidents or recordables. Weekly safety meetings were conducted by the Wegman Foreman. Audits were performed randomly, and all safety procedures were up to out strict guidelines.